A 1940 Lindén-type machine-gun position on a Dalsland summit, built to defend a nearby bridge, with a characteristic cap and protected shelter/accommodation below; restored in 2006.
No standardized area published
Published date and precision preserved
Completion date not established
Unit-attributed from its source article
Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware.
Provisional audited central concept screen; expected-risk calibration is pending. It is not yet a risk-adjusted expected cost.
Method, scope and confidence →4 photographs sourced from the original article, with captions where available.
Published, calculated and proxy dimensions are deliberately separated. Missing evidence stays visible instead of becoming zero.
Rock in place removed before bulking; the excavation-pricing quantity.
Internal airspace; not the amount of rock removed.
Blasted material after bulking; the haul and disposal quantity.
These cubic metres are not interchangeable.
Usable, floor or footprint area; the label is preserved because these are not always interchangeable.
No usable quantity in the reviewed source · Evidence gapRock in place removed before bulking; the quantity used to price excavation.
The audited morphology is not a rock-excavation class. · Audited morphologyInternal air or chamber volume. It is not solid excavation without overbreak, access and support geometry.
No usable quantity in the reviewed source · Evidence gapBlasted material after bulking, or its handled mass. No swollen cubic metres are inferred when only tonnes are modelled.
No rock mass-handling scope applies to the audited morphology. · Audited morphologyLength alone is insufficient; a costable tunnel also needs width, height or cross-sectional area.
No tunnel geometry applies to the audited morphology. · Audited morphologyPublished chamber or arch geometry used to test volume and support assumptions.
No usable quantity in the reviewed source · Evidence gapRock surface requiring bolts, mesh or shotcrete, preferably measured in square metres.
Rock-support surface does not apply to this audited morphology. · Audited morphologyCounts and dimensions of access, transfer, utility and emergency interfaces.
No usable quantity in the reviewed source · Evidence gapCast inner structures and linings, kept separate from excavated rock and reinforcement mass.
No usable quantity in the reviewed source · Evidence gapGroundwater, inflow, drainage, pumping and moisture-control evidence affecting construction and operation.
No usable quantity in the reviewed source · Evidence gapThe headline answers the current replacement question. Historic cost, CPI and construction-index comparisons remain separate because they answer different questions.
Different specifications receive different estimates; they are not used as the upper and lower limits of one answer.
Preserves documented capacity, protection, autonomy and redundancy using current construction methods.
Requires a modern structural, fire, protection and supplier performance brief.
Requires IT load, cooling topology, grid capacity, redundancy and autonomy. Server hardware is excluded.
No representative facility construction cost selected
General purchasing-power comparison—not a construction quote
Broad BKI proxy—not a bunker-specific rebuild price
Scope lock. Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware. The article supports one 1940 hilltop machine-gun position of the Lindén/kg-hat type, with a cupola above shelter and crew accommodation. It describes bomb/artillery resistance qualitatively and notes a 2006 restoration, but gives no dimensions, material quan…
Audit revision sweden-replacement-audit-2026.08.15. The central WBS below incorporates the 61-article review. The former deterministic low/base/high cases remain available only as sensitivities and revision history.
Direct works + owner / design / investigation + legacy concept contingency
Central quantities × current installed-rate screen.
Not yet probability-weighted. The current legacy concept contingency remains separate.
22% applied to the direct-work screen.
Raw model SEK 7.1m · rounded for Confidence E.
Transitional limitation. SEK 1,200,000 is still a blanket concept contingency, not probability-weighted expected risk. This is why the amount is labelled provisional. The audited small bunker WBS remains the central scope ledger.
One documented Lindén-type machine-gun position; dimensions are not published.
13/100 article-geometry completeness. Detailed source extraction is available in the original-article audit.
Confidence E · geometry completeness 13/100
Largest active lines in the audited central component schedule.
The workbook publishes one revised central schedule. Its prior low and high stress cases are retained only under sensitivities; no line-level probability distributions are implied.
No explicit active base-WBS line.
No explicit active base-WBS line.
No explicit active base-WBS line.
| Change | Scope | Audited base | Quantity / rate basis | Provenance |
|---|---|---|---|---|
| Retained | 11Compact bunker unit or positionSmall Fortification | SEK 4,800,000 | 1 Bunker × SEK 4,800,000 / BunkerPublished quantity · Derived rateThe article describes one focal position. | Existing archive WBS |
Active base WBS SEK 4,800,000 · owner/design and contingency are added in the scenario cards above · 12 removed rows across the archive remain visible as change history.
The three inputs most likely to move the current screen.
These deterministic stress cases simultaneously vary quantities, rates, scope allowances and contingency. They are not confidence intervals and no longer serve as the headline answer.
Links support a rate, scope boundary or method. Context-only sources are not represented as quotations.
Provider-listed starting prices include VAT. They are divided by 1.25 for an ex-VAT sanity check and used only for compact bunker units.
Defend the bridge immediately north and dominate surrounding terrain during the 1940 invasion threat.
Construction began in response to the German invasion of Norway.
B003Built for wartime bridge defence.
B003Position restored by the entity the publisher names Fortifikationsförvaltningen.
B006Restored.
B0067 reviewed claims. Evidence locators resolve against the stored article hash or archived snapshot.
| Subject | Claim | Value | Date | Evidence | Certainty |
|---|---|---|---|---|---|
| milestone | Event | Construction began in response to the German invasion of Norway. | 1940 | B003 | Reported |
| milestone | Event | Position restored by the entity the publisher names Fortifikationsförvaltningen. | 2006 | B006 | Reported |
| lifecycle summary | Event | Built for wartime bridge defence. | 1940 | B003 | Reported |
| lifecycle summary | Event | Restored. | 2006 | B006 | Reported |
| technical system | Habitability | Shelter and crew accommodation located under the top cupola. | — | B004 | Reported |
| protection | Bomb And Artillery Resistance | Publisher describes the Lindén design as able to resist aerial bombing and artillery fire; no engineering rating is given. | — | B004 | Reported |
| protection | Elevated Siting | High siting reduced exposure to direct tank-gun fire and supported all-round terrain dominance. | — | B005 | Reported |