Archived article on a rare 900 m² / 9,688 ft² two-level earth-covered domed concrete HC begun circa 1965 for 50 people, with 100 kW standby generation and F70 radio.
Floor Area · reported
Start date not established
Completion date not established
No unit-attributed image published
Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware.
Provisional audited central concept screen; expected-risk calibration is pending. It is not yet a risk-adjusted expected cost.
Method, scope and confidence →Published, calculated and proxy dimensions are deliberately separated. Missing evidence stays visible instead of becoming zero.
Rock in place removed before bulking; the excavation-pricing quantity.
Internal airspace; not the amount of rock removed.
Blasted material after bulking; the haul and disposal quantity.
These cubic metres are not interchangeable.
Usable, floor or footprint area; the label is preserved because these are not always interchangeable.
Floor Area · reported · Publisher articleRock in place removed before bulking; the quantity used to price excavation.
12% of structural scope as a buried-class screen · Audit revisionInternal air or chamber volume. It is not solid excavation without overbreak, access and support geometry.
No usable quantity in the reviewed source · Evidence gapBlasted material after bulking, or its handled mass. No swollen cubic metres are inferred when only tonnes are modelled.
No rock mass-handling scope applies to the audited morphology. · Audited morphologyLength alone is insufficient; a costable tunnel also needs width, height or cross-sectional area.
No tunnel geometry applies to the audited morphology. · Audited morphologyPublished chamber or arch geometry used to test volume and support assumptions.
No usable quantity in the reviewed source · Evidence gapRock surface requiring bolts, mesh or shotcrete, preferably measured in square metres.
Rock-support surface does not apply to this audited morphology. · Audited morphologyCounts and dimensions of access, transfer, utility and emergency interfaces.
Archetype portal/escape count. · Reviewed base modelCast inner structures and linings, kept separate from excavated rock and reinforcement mass.
Reported facility floor/shelter area is used as the screening usable-area basis. Archetype concrete factor is 2 m³ per usable m². · Reviewed base modelGroundwater, inflow, drainage, pumping and moisture-control evidence affecting construction and operation.
Water · Publisher articleThe headline answers the current replacement question. Historic cost, CPI and construction-index comparisons remain separate because they answer different questions.
Different specifications receive different estimates; they are not used as the upper and lower limits of one answer.
Preserves documented capacity, protection, autonomy and redundancy using current construction methods.
Requires a modern structural, fire, protection and supplier performance brief.
Requires IT load, cooling topology, grid capacity, redundancy and autonomy. Server hardware is excluded.
No representative facility construction cost selected
General purchasing-power comparison—not a construction quote
Broad BKI proxy—not a bunker-specific rebuild price
Scope lock. Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware. The article supports an approximately 1965 earth-covered, round/domed, two-storey concrete command centre created by excavating a hill, with 900 m² / 9,688 ft² total floor area and 50-person capacity. It identifies a roughly 100 kW generator, well-water treat…
Audit revision sweden-replacement-audit-2026.08.15. The central WBS below incorporates the 61-article review. The former deterministic low/base/high cases remain available only as sensitivities and revision history.
Direct works + owner / design / investigation + legacy concept contingency
Central quantities × current installed-rate screen.
Not yet probability-weighted. The current legacy concept contingency remains separate.
22% applied to the direct-work screen.
Raw model SEK 128.9m · rounded for Confidence E.
Transitional limitation. SEK 21,927,750 is still a blanket concept contingency, not probability-weighted expected risk. This is why the amount is labelled provisional. The audited command buried WBS remains the central scope ledger.
Archived-source physical facility; dome thickness is not published.
48/100 article-geometry completeness. Detailed source extraction is available in the original-article audit.
Confidence E · geometry completeness 48/100
Largest active lines in the audited central component schedule.
The workbook publishes one revised central schedule. Its prior low and high stress cases are retained only under sensitivities; no line-level probability distributions are implied.
Excavation, temporary works, waterproofing and backfill · SEK 1,512,000
Drainage, sumps and moisture control · SEK 504,000
Integrated testing, commissioning and public-safe documentation · SEK 2,925,000
| Change | Scope | Audited base | Quantity / rate basis | Provenance |
|---|---|---|---|---|
| Retained | 03High-mass reinforced-concrete shellStructural | SEK 12,600,000 | 1,800 m³ × SEK 7,000 / m³Derived From Published quantity · Assumption rateReported facility floor/shelter area is used as the screening usable-area basis. Archetype concrete factor is 2 m³ per usable m². | Existing archive WBS |
| Retained | 04Installed reinforcementStructural | SEK 5,670,000 | 162,000 Kg × SEK 35 / KgDerived From Published quantity · Assumption rateReported facility floor/shelter area is used as the screening usable-area basis. Archetype concrete factor is 2 m³ per usable m². Archetype reinforcement intensity is 90 kg per concrete m³. | Existing archive WBS |
| Retained | 05Interior construction and conventional MEPBuilding Services | SEK 40,500,000 | 900 m² / 9,688 ft² × SEK 45,000 / Usable m²Derived From Published quantity · Assumption rateReported facility floor/shelter area is used as the screening usable-area basis. Fit-out factor is 1 times the reference scale. | Existing archive WBS |
| Retained | 06Protection, resilience and standby systemsProtection | SEK 18,000,000 | 1 Project × SEK 18,000,000 / ProjectAssumption quantity · Assumption rateOne protection package per 900 usable m² / 9,688 ft², subject to a 0.5-package minimum. | Existing archive WBS |
| Retained | 07Buried access, escape and utility interfacesSite And Access | SEK 6,000,000 | 1 Project × SEK 6,000,000 / ProjectAssumption quantity · Assumption rateArchetype portal/escape count. | Existing archive WBS |
| Added | R172Excavation, temporary works, waterproofing and backfill | SEK 1,512,000 | 12% of structural scope as a buried-class screen | Class assumption — earthworks take-off required |
| Added | R173Drainage, sumps and moisture control | SEK 504,000 | 4% of structural scope as a buried-class screen | Class assumption — site investigation/RFQ required |
| Added | R174Integrated testing, commissioning and public-safe documentation | SEK 2,925,000 | 5% of MEP/protection/mission-system scope | Class assumption — commissioning plan required |
Active base WBS SEK 87,711,000 · owner/design and contingency are added in the scenario cards above · 12 removed rows across the archive remain visible as change history.
The three inputs most likely to move the current screen.
These deterministic stress cases simultaneously vary quantities, rates, scope allowances and contingency. They are not confidence intervals and no longer serve as the headline answer.
Links support a rate, scope boundary or method. Context-only sources are not represented as quotations.
Public ready-mix material check only; installed underground rates require RFQ.
Public retail material check only; cutting, bending, fixing, waste and underground logistics require RFQ.
Ordinary critical-facility sanity check, not protected-bunker equivalence.
Public sources establish specialized tested products but not project prices.
Protected civil command post for coordinating medical, fire and clearance/rescue actions.
Groundworks began by excavating a hill for the new main command post.
B004Article uses present tense for monthly generator tests and a modern digital exchange, but gives no explicit operator, ownership or date-stamped status.
B005,B006 · B005 · B006Publisher-reported features, not a current engineering inspection or certification.
Command room, communications room, switchboard, equipment room and offices; legacy and modern digital telephone exchanges plus four-channel F70 radio.
B004 · B005Six-cylinder Volvo diesel generator around 100 kW, tested monthly; second generator bought but not installed.
B006Own well with filtration and softening.
B006Stone and gas filters and cooling compressor.
B006Machine room, dining, kitchen, sleeping spaces and toilets on lower floor; self-sufficient for a few days.
B004 · B007Round, domed two-level concrete bunker, reported as one of only two of this construction; covered first with stone and then earth.
B003 · B004 · B007Publisher reports protection against normally dimensioned bombs and gas attacks, without a quantified rating.
B00715 reviewed claims. Evidence locators resolve against the stored article hash or archived snapshot.
| Subject | Claim | Value | Date | Evidence | Certainty |
|---|---|---|---|---|---|
| milestone | Event | Groundworks began by excavating a hill for the new main command post. | 1965 | B004 | Reported |
| lifecycle summary | Event | Article uses present tense for monthly generator tests and a modern digital exchange, but gives no explicit operator, ownership or date-stamped status. | article era | B005,B006 | Reported |
| quantitative observation | Floor Area | 900 m² / 9,688 ft² | — | B004 | Reported |
| quantitative observation | Floors | 2 floors | — | B004 | Reported |
| quantitative observation | Standby Generator Output | 100 kW | — | B006 | Reported |
| quantitative observation | F70 Channels | 4 channels | — | B005 | Reported |
| quantitative observation | Mobilisation Time | 6 hours | — | B007 | Reported |
| quantitative observation | Nominal Capacity | 50 persons | — | B007 | Reported |
| technical system | Command And Comms | Command room, communications room, switchboard, equipment room and offices; legacy and modern digital telephone exchanges plus four-channel F70 radio. | — | B004,B005 | Reported |
| technical system | Power | Six-cylinder Volvo diesel generator around 100 kW, tested monthly; second generator bought but not installed. | — | B006 | Reported |
| technical system | Water | Own well with filtration and softening. | — | B006 | Reported |
| technical system | Air | Stone and gas filters and cooling compressor. | — | B006 | Reported |
| technical system | Habitability | Machine room, dining, kitchen, sleeping spaces and toilets on lower floor; self-sufficient for a few days. | — | B004,B007 | Reported |
| protection | Rare Circular Dome | Round, domed two-level concrete bunker, reported as one of only two of this construction; covered first with stone and then earth. | — | B003,B004,B007 | Reported |
| protection | Weapon/CBRN | Publisher reports protection against normally dimensioned bombs and gas attacks, without a quantified rating. | — | B007 | Reported |