Rock-cut coastal fort in Gothenburg's Västerberget, blasted from 1899 and completed war-ready in 1907 with protected accommodation, utilities and heavy artillery.
No standardized area published
Published date and precision preserved
Published date and precision preserved
Unit-attributed from its source article
Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware.
Provisional audited central concept screen; expected-risk calibration is pending. It is not yet a risk-adjusted expected cost.
Method, scope and confidence →26 photographs sourced from the original article, with captions where available.
Published, calculated and proxy dimensions are deliberately separated. Missing evidence stays visible instead of becoming zero.
Rock in place removed before bulking; the excavation-pricing quantity.
Internal airspace; not the amount of rock removed.
Blasted material after bulking; the haul and disposal quantity.
These cubic metres are not interchangeable.
Usable, floor or footprint area; the label is preserved because these are not always interchangeable.
No usable quantity in the reviewed source · Evidence gapRock in place removed before bulking; the quantity used to price excavation.
Proxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype cavern-envelope factor is 6.5 design m³ per usable m². · Prior model input reviewed by auditInternal air or chamber volume. It is not solid excavation without overbreak, access and support geometry.
No usable quantity in the reviewed source · Evidence gapBlasted material after bulking, or its handled mass. No swollen cubic metres are inferred when only tonnes are modelled.
Proxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype cavern-envelope factor is 6.5 design m³ per usable m². Mass uses an assumed Swedish hard-rock d… · Reviewed mass-handling modelLength alone is insufficient; a costable tunnel also needs width, height or cross-sectional area.
No usable quantity in the reviewed source · Evidence gapPublished chamber or arch geometry used to test volume and support assumptions.
No usable quantity in the reviewed source · Evidence gapRock surface requiring bolts, mesh or shotcrete, preferably measured in square metres.
No support-area quantity is published · Audited excavation scopeCounts and dimensions of access, transfer, utility and emergency interfaces.
Archetype portal/escape count. · Reviewed base modelCast inner structures and linings, kept separate from excavated rock and reinforcement mass.
Proxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype concrete factor is 1.2 m³ per usable m². · Reviewed base modelGroundwater, inflow, drainage, pumping and moisture-control evidence affecting construction and operation.
No usable quantity in the reviewed source · Evidence gapThe headline answers the current replacement question. Historic cost, CPI and construction-index comparisons remain separate because they answer different questions.
Different specifications receive different estimates; they are not used as the upper and lower limits of one answer.
Preserves documented capacity, protection, autonomy and redundancy using current construction methods.
Requires a modern structural, fire, protection and supplier performance brief.
Requires IT load, cooling topology, grid capacity, redundancy and autonomy. Server hardware is excluded.
No representative facility construction cost selected
General purchasing-power comparison—not a construction quote
Broad BKI proxy—not a bunker-specific rebuild price
Scope lock. Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware. The article establishes an 1899–1907 rock fort for roughly 300 personnel, long internal galleries and support rooms, blasted storm ditches, eight stated principal gun positions, electric light, water closets and telephone service. It also describes the separa…
Audit revision sweden-replacement-audit-2026.08.15. The central WBS below incorporates the 61-article review. The former deterministic low/base/high cases remain available only as sensitivities and revision history.
Direct works + owner / design / investigation + legacy concept contingency
Central quantities × current installed-rate screen.
Not yet probability-weighted. The current legacy concept contingency remains separate.
22% applied to the direct-work screen.
Raw model SEK 631.3m · rounded for Confidence E.
Transitional limitation. SEK 107,364,688 is still a blanket concept contingency, not probability-weighted expected risk. This is why the amount is labelled provisional. The audited fort rock WBS remains the central scope ledger.
Inclusive historic fort; Götiska battery is also represented as a component record.
28/100 article-geometry completeness. Detailed source extraction is available in the original-article audit.
Confidence E · geometry completeness 28/100
Do not add this blindly to related records. Inclusive of Götiska battery; do not add se-oscar-ii-fort-gotiska-batteriet.
Largest active lines in the audited central component schedule.
The workbook publishes one revised central schedule. Its prior low and high stress cases are retained only under sensitivities; no line-level probability distributions are implied.
Hydrogeology, drainage, pumping and moisture control · SEK 13,650,000
Hydrogeology, drainage, pumping and moisture control · SEK 13,650,000
Integrated testing, commissioning and public-safe documentation · SEK 4,200,000
| Change | Scope | Audited base | Quantity / rate basis | Provenance |
|---|---|---|---|---|
| Retained | 01Fort galleries and supported excavationCivil Rock | SEK 170,625,000 | 22,750 Solid Design m³ × SEK 7,500 / Solid Design m³Class Proxy quantity · Assumption rateProxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype cavern-envelope factor is 6.5 design m³ per usable m². | Existing archive WBS |
| Retained | 02Rock mass handlingMass Handling | SEK 6,028,750 | 60,288 T × SEK 100 / TClass Proxy quantity · Derived rateProxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype cavern-envelope factor is 6.5 design m³ per usable m². Mass uses an assumed Swedish hard-rock density of 2.65 t/m³. | Existing archive WBS |
| Retained | 03Concrete roofs, galleries and emplacementsStructural | SEK 29,400,000 | 4,200 m³ × SEK 7,000 / m³Class Proxy quantity · Assumption rateProxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype concrete factor is 1.2 m³ per usable m². | Existing archive WBS |
| Retained | 04Installed reinforcementStructural | SEK 9,555,000 | 273,000 Kg × SEK 35 / KgClass Proxy quantity · Assumption rateProxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Archetype concrete factor is 1.2 m³ per usable m². Archetype reinforcement intensity is 65 kg per concrete m³. | Existing archive WBS |
| Retained | 05Support-space fit-out and utilitiesBuilding Services | SEK 42,000,000 | 2,800 m² / 30,139 ft² × SEK 15,000 / Usable m²Class Proxy quantity · Assumption rateProxy support/gallery area for a 300-person rock fort with eight principal gun positions and utilities. Fit-out factor is 0.8 times the reference scale. | Existing archive WBS |
| Retained | 06Protection and resilient systemsProtection | SEK 42,000,000 | 2.33 Project × SEK 18,000,000 / ProjectAssumption quantity · Assumption rateOne protection package per 1500 usable m² / 16,146 ft², subject to a 1-package minimum. | Existing archive WBS |
| Retained | 07Entrances, exits and site interfacesSite And Access | SEK 12,000,000 | 2 Project × SEK 6,000,000 / ProjectAssumption quantity · Assumption rateArchetype portal/escape count. | Existing archive WBS |
| Retained | 09Civil emplacement packagesMission Civil | SEK 100,000,000 | 4 Emplacement × SEK 25,000,000 / EmplacementAssumption quantity · Assumption rateArchetype mission-package count. | Existing archive WBS |
| Added | R502Hydrogeology, drainage, pumping and moisture control | SEK 13,650,000 | 8% of supported-rock scope as a class-screening allowance | Class assumption — site investigation/RFQ required |
| Added | R503Integrated testing, commissioning and public-safe documentation | SEK 4,200,000 | 5% of MEP/protection/mission-system scope | Class assumption — commissioning plan required |
Active base WBS SEK 429,458,750 · owner/design and contingency are added in the scenario cards above · 12 removed rows across the archive remain visible as change history.
The three inputs most likely to move the current screen.
These deterministic stress cases simultaneously vary quantities, rates, scope allowances and contingency. They are not confidence intervals and no longer serve as the headline answer.
Links support a rate, scope boundary or method. Context-only sources are not represented as quotations.
Gryaab February-2024 long-tunnel benchmark: SEK 5,513/design m³ for excavation plus support. Low case is lightly currentized; base/high add small, constrained, non-repetitive bunker uncertainty.
Gryaab February-2024 long-tunnel benchmark: SEK 5,513/design m³ for excavation plus support. Low case is lightly currentized; base/high add small, constrained, non-repetitive bunker uncertainty.
Skanska's Ostlanken order value is SEK 240m for handling 2.0m tonnes of rock and 0.4m tonnes of soil, excluding options. The base is the observed blended benchmark; bounds are assumptions.
Public ready-mix material check only; installed underground rates require RFQ.
Public retail material check only; cutting, bending, fixing, waste and underground logistics require RFQ.
Public sources establish specialized tested products but not project prices.
Defend the sea approaches to Gothenburg.
First blast for the fort.
B004Completed and war-ready after eight years of work.
B005Main active-service period reported for the fort.
B005,B006Main fort ceased active service.
B006Drawdown and final withdrawal of the main fort.
B006Main fort was fully withdrawn.
B006Associated Götiska battery remained active until this year.
B00817 reviewed claims. Evidence locators resolve against the stored article hash or archived snapshot.
| Subject | Claim | Value | Date | Evidence | Certainty |
|---|---|---|---|---|---|
| milestone | Event | First blast for the fort. | 1899-08-24 | B004 | Reported |
| milestone | Event | Completed and war-ready after eight years of work. | 1907 | B005 | Reported |
| milestone | Event | Main fort ceased active service. | 1955 | B006 | Reported |
| milestone | Event | Main fort was fully withdrawn. | 1970s | B006 | Reported |
| milestone | Event | Associated Götiska battery remained active until this year. | 1986 | B008 | Reported |
| lifecycle summary | Event | Main active-service period reported for the fort. | 1907–1955 | B005,B006 | Reported |
| lifecycle summary | Event | Drawdown and final withdrawal of the main fort. | 1955–1970s | B006 | Reported |
| quantitative observation | Construction Duration | 8 years | — | B005 | Reported |
| quantitative observation | Wartime Staff | 300 persons | — | B005 | Reported |
| quantitative observation | Main Armament 24cm | 2 guns | — | B007 | Reported |
| quantitative observation | Main Armament 15 2cm | 2 guns | — | B007 | Reported |
| quantitative observation | Secondary Armament 57mm | 4 guns | — | B007 | Reported |
| technical system | Utilities | Electricity, water, toilets and telephone were provided within the fort. | — | B005 | Reported |
| technical system | Habitability | Stores, mess and quarters supported the garrison. | — | B005 | Reported |
| technical system | Armament | Heavy and secondary guns plus caponier defence. | — | B007 | Reported |
| protection | Rock Cover | Principal spaces and fighting positions were excavated into Västerberget. | — | B004,B005 | Reported |
| protection | Caponier Defence | Caponier positions protected the fort's approaches. | — | B007 | Reported |
No named project parties were extracted.