No standardized area published
Assembling intelligence…
Reading listings, research log, and source-health evidence.
Reading listings, research log, and source-health evidence.

Concealed rock-cut flank and barrier battery sponsored by Götiska förbundet at Göteborg's harbour entrance, built as part of Oscar II Fort and operational until 1986, with four 5.7 cm guns, protected ammunition storage, quarters, power and a searchlight gallery.
No standardized area published
Start date not established
Published date and precision preserved
Unit-attributed from its source article
Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware.
Provisional audited central concept screen; expected-risk calibration is pending. It is not yet a risk-adjusted expected cost.
Method, scope and confidence →16 photographs sourced from the original article, with captions where available.
Published, calculated and proxy dimensions are deliberately separated. Missing evidence stays visible instead of becoming zero.
Rock in place removed before bulking; the excavation-pricing quantity.
Internal airspace; not the amount of rock removed.
Blasted material after bulking; the haul and disposal quantity.
These cubic metres are not interchangeable.
Usable, floor or footprint area; the label is preserved because these are not always interchangeable.
No usable quantity in the reviewed source · Evidence gapRock in place removed before bulking; the quantity used to price excavation.
Proxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype cavern-envelope factor is 6.5 design m³ per usable m². · Prior model input reviewed by auditInternal air or chamber volume. It is not solid excavation without overbreak, access and support geometry.
No usable quantity in the reviewed source · Evidence gapBlasted material after bulking, or its handled mass. No swollen cubic metres are inferred when only tonnes are modelled.
Proxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype cavern-envelope factor is 6.5 design m³ per usable m². Mass uses an assumed Swedish hard-ro… · Reviewed mass-handling modelLength alone is insufficient; a costable tunnel also needs width, height or cross-sectional area.
No usable quantity in the reviewed source · Evidence gapPublished chamber or arch geometry used to test volume and support assumptions.
No usable quantity in the reviewed source · Evidence gapRock surface requiring bolts, mesh or shotcrete, preferably measured in square metres.
No support-area quantity is published · Audited excavation scopeCounts and dimensions of access, transfer, utility and emergency interfaces.
Archetype portal/escape count. · Reviewed base modelCast inner structures and linings, kept separate from excavated rock and reinforcement mass.
Proxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype concrete factor is 1.2 m³ per usable m². · Reviewed base modelGroundwater, inflow, drainage, pumping and moisture-control evidence affecting construction and operation.
No usable quantity in the reviewed source · Evidence gapThe headline answers the current replacement question. Historic cost, CPI and construction-index comparisons remain separate because they answer different questions.
Different specifications receive different estimates; they are not used as the upper and lower limits of one answer.
Preserves documented capacity, protection, autonomy and redundancy using current construction methods.
Requires a modern structural, fire, protection and supplier performance brief.
Requires IT load, cooling topology, grid capacity, redundancy and autonomy. Server hardware is excluded.
No representative facility construction cost selected
General purchasing-power comparison—not a construction quote
Broad BKI proxy—not a bunker-specific rebuild price
Scope lock. Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware. The Götiska battery is a single rock-cut flank/blocking battery within Oscar II fort, begun in the 1902 fort-building context and operational until 1986. Its layout comprises a main gated room, two rock-tunnel branches, four 5.7 cm gun positions with concrete…
Audit revision sweden-replacement-audit-2026.08.15. The central WBS below incorporates the 61-article review. The former deterministic low/base/high cases remain available only as sensitivities and revision history.
Direct works + owner / design / investigation + legacy concept contingency
Central quantities × current installed-rate screen.
Not yet probability-weighted. The current legacy concept contingency remains separate.
22% applied to the direct-work screen.
Raw model SEK 272.8m · rounded for Confidence E.
Transitional limitation. SEK 46,392,938 is still a blanket concept contingency, not probability-weighted expected risk. This is why the amount is labelled provisional. The audited fort rock WBS remains the central scope ledger.
A four-gun rock battery component associated with Oscar II Fort.
31/100 article-geometry completeness. Detailed source extraction is available in the original-article audit.
Confidence E · geometry completeness 31/100
Do not add this blindly to related records. Component of se-fv-oscar-ii-fort. Source data currently carries the unmatched parent ID se-oscar-ii-fort; do not double count.
Largest active lines in the audited central component schedule.
The workbook publishes one revised central schedule. Its prior low and high stress cases are retained only under sensitivities; no line-level probability distributions are implied.
Hydrogeology, drainage, pumping and moisture control · SEK 2,730,000
Hydrogeology, drainage, pumping and moisture control · SEK 2,730,000
Integrated testing, commissioning and public-safe documentation · SEK 1,320,000
| Change | Scope | Audited base | Quantity / rate basis | Provenance |
|---|---|---|---|---|
| Retained | 01Fort galleries and supported excavationCivil Rock | SEK 34,125,000 | 4,550 Solid Design m³ × SEK 7,500 / Solid Design m³Class Proxy quantity · Assumption rateProxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype cavern-envelope factor is 6.5 design m³ per usable m². | Existing archive WBS |
| Retained | 02Rock mass handlingMass Handling | SEK 1,205,750 | 12,058 T × SEK 100 / TClass Proxy quantity · Derived rateProxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype cavern-envelope factor is 6.5 design m³ per usable m². Mass uses an assumed Swedish hard-rock density of 2.65 t/m³. | Existing archive WBS |
| Retained | 03Concrete roofs, galleries and emplacementsStructural | SEK 5,880,000 | 840 m³ × SEK 7,000 / m³Class Proxy quantity · Assumption rateProxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype concrete factor is 1.2 m³ per usable m². | Existing archive WBS |
| Retained | 04Installed reinforcementStructural | SEK 1,911,000 | 54,600 Kg × SEK 35 / KgClass Proxy quantity · Assumption rateProxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Archetype concrete factor is 1.2 m³ per usable m². Archetype reinforcement intensity is 65 kg per concrete m³. | Existing archive WBS |
| Retained | 05Support-space fit-out and utilitiesBuilding Services | SEK 8,400,000 | 560 m² / 6,028 ft² × SEK 15,000 / Usable m²Class Proxy quantity · Assumption rateProxy gallery/support area for four gun positions, ammunition, quarters, utilities and searchlight gallery. Fit-out factor is 0.8 times the reference scale. | Existing archive WBS |
| Retained | 06Protection and resilient systemsProtection | SEK 18,000,000 | 1 Project × SEK 18,000,000 / ProjectAssumption quantity · Assumption rateOne protection package per 1500 usable m² / 16,146 ft², subject to a 1-package minimum. | Existing archive WBS |
| Retained | 07Entrances, exits and site interfacesSite And Access | SEK 12,000,000 | 2 Project × SEK 6,000,000 / ProjectAssumption quantity · Assumption rateArchetype portal/escape count. | Existing archive WBS |
| Retained | 09Civil emplacement packagesMission Civil | SEK 100,000,000 | 4 Emplacement × SEK 25,000,000 / EmplacementPublished quantity · Assumption rateFour 5.7 cm gun positions are reported. | Existing archive WBS |
| Added | R415Hydrogeology, drainage, pumping and moisture control | SEK 2,730,000 | 8% of supported-rock scope as a class-screening allowance | Class assumption — site investigation/RFQ required |
| Added | R416Integrated testing, commissioning and public-safe documentation | SEK 1,320,000 | 5% of MEP/protection/mission-system scope | Class assumption — commissioning plan required |
Active base WBS SEK 185,571,750 · owner/design and contingency are added in the scenario cards above · 12 removed rows across the archive remain visible as change history.
The three inputs most likely to move the current screen.
These deterministic stress cases simultaneously vary quantities, rates, scope allowances and contingency. They are not confidence intervals and no longer serve as the headline answer.
Links support a rate, scope boundary or method. Context-only sources are not represented as quotations.
Gryaab February-2024 long-tunnel benchmark: SEK 5,513/design m³ for excavation plus support. Low case is lightly currentized; base/high add small, constrained, non-repetitive bunker uncertainty.
Gryaab February-2024 long-tunnel benchmark: SEK 5,513/design m³ for excavation plus support. Low case is lightly currentized; base/high add small, constrained, non-repetitive bunker uncertainty.
Skanska's Ostlanken order value is SEK 240m for handling 2.0m tonnes of rock and 0.4m tonnes of soil, excluding options. The base is the observed blended benchmark; bounds are assumptions.
Public ready-mix material check only; installed underground rates require RFQ.
Public retail material check only; cutting, bending, fixing, waste and underground logistics require RFQ.
Public sources establish specialized tested products but not project prices.
Protect Oscar II Fort's northern flank and bar Göta älv with a concealed surprise position.
Long military operational period with later power and CBRN modifications.
B004,B007,B012Construction under way as part of the new Älvsborg/Oscar II fortress works.
B004Battery completed before Oscar II Fort as a whole.
B004Internal generating engine removed after direct external power from Trollhättan became available; exact year unknown.
B007Military operational service ended.
B004Decommissioned; searchlight water gate was bricked up and equipment removed.
B01617 reviewed claims. Evidence locators resolve against the stored article hash or archived snapshot.
| Subject | Claim | Value | Date | Evidence | Certainty |
|---|---|---|---|---|---|
| milestone | Event | Construction under way as part of the new Älvsborg/Oscar II fortress works. | 1902 | B004 | Reported |
| milestone | Event | Battery completed before Oscar II Fort as a whole. | before 1907 | B004 | Reported |
| milestone | Event | Internal generating engine removed after direct external power from Trollhättan became available; exact year unknown. | after 1939 | B007 | Reported |
| milestone | Event | Military operational service ended. | 1986 | B004 | Reported |
| lifecycle summary | Event | Long military operational period with later power and CBRN modifications. | early 1900s-1986 | B004,B007,B012 | Reported |
| lifecycle summary | Event | Decommissioned; searchlight water gate was bricked up and equipment removed. | after 1986 | B016 | Reported |
| quantitative observation | Guns | 4 5 7 cm guns | — | B005,B012 | Reported |
| quantitative observation | Officer Quarters Capacity | 3–4 | — | B008 | Reported |
| quantitative observation | Toilets | 2 toilets | — | B008 | Reported |
| technical system | Power | Originally had its own generating engine; later received a reported dedicated supply from Trollhättan. | — | B007 | Reported |
| technical system | Communications | Speaking tube linked officer room to the searchlight area. | — | B008,B016 | Reported |
| technical system | Habitability | Officer and enlisted quarters, toilets, kitchen and messing space. | — | B008,B012 | Reported |
| technical system | Searchlight | Rail, turntable and protected storage gallery served a powerful searchlight. | — | B016 | Reported |
| protection | Concealment And Rock | Gun and support spaces were concealed within granite and behind the harbour-facing moat. | — | B004,B011 | Reported |
| protection | Protected Ammunition Store | Ammunition room was cut to reduce ignition risk from enemy fire. | — | B011 | Reported |
| protection | CBRN Modification | Enlisted accommodation was later modified to provide a space protected against chemical warfare agents. | — | B012 | Reported |
| protection | Close Defence | Moat, pistol ports and interlocking double iron-door pairs complicated assault. | — | B005 | Reported |