No standardized area published
Assembling intelligence…
Reading listings, research log, and source-health evidence.
Reading listings, research log, and source-health evidence.
The archive documents Älvsborg Radio rock facility as a protected radio station in a rock cavern. Its documented role was protected shortwave communications for the naval command. Shortwave radio function received a separate protected cavern at Hängesten.
No standardized area published
Start date not established
Completion date not established
No unit-attributed image · 25 in the source article
Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware.
Provisional audited central concept screen; expected-risk calibration is pending. It is not yet a risk-adjusted expected cost.
Method, scope and confidence →Published, calculated and proxy dimensions are deliberately separated. Missing evidence stays visible instead of becoming zero.
Rock in place removed before bulking; the excavation-pricing quantity.
Internal airspace; not the amount of rock removed.
Blasted material after bulking; the haul and disposal quantity.
These cubic metres are not interchangeable.
Usable, floor or footprint area; the label is preserved because these are not always interchangeable.
No usable quantity in the reviewed source · Evidence gapRock in place removed before bulking; the quantity used to price excavation.
The audited morphology is not a rock-excavation class. · Audited morphologyInternal air or chamber volume. It is not solid excavation without overbreak, access and support geometry.
No usable quantity in the reviewed source · Evidence gapBlasted material after bulking, or its handled mass. No swollen cubic metres are inferred when only tonnes are modelled.
No rock mass-handling scope applies to the audited morphology. · Audited morphologyLength alone is insufficient; a costable tunnel also needs width, height or cross-sectional area.
No usable quantity in the reviewed source · Evidence gapPublished chamber or arch geometry used to test volume and support assumptions.
No usable quantity in the reviewed source · Evidence gapRock surface requiring bolts, mesh or shotcrete, preferably measured in square metres.
Rock-support surface does not apply to this audited morphology. · Audited morphologyCounts and dimensions of access, transfer, utility and emergency interfaces.
No usable quantity in the reviewed source · Evidence gapCast inner structures and linings, kept separate from excavated rock and reinforcement mass.
No usable quantity in the reviewed source · Evidence gapGroundwater, inflow, drainage, pumping and moisture-control evidence affecting construction and operation.
No usable quantity in the reviewed source · Evidence gapThe headline answers the current replacement question. Historic cost, CPI and construction-index comparisons remain separate because they answer different questions.
Different specifications receive different estimates; they are not used as the upper and lower limits of one answer.
Preserves documented capacity, protection, autonomy and redundancy using current construction methods.
Requires a modern structural, fire, protection and supplier performance brief.
Requires IT load, cooling topology, grid capacity, redundancy and autonomy. Server hardware is excluded.
No representative facility construction cost selected
General purchasing-power comparison—not a construction quote
Broad BKI proxy—not a bunker-specific rebuild price
Scope lock. Functional recreation of the documented facility in Sweden using current construction methods and 2026 prices, preserving the documented capacity, protection, autonomy and redundancy. Ex VAT; excluding land, financing, remediation, classified mission equipment and data-centre hardware. The article spans a naval-base campus and several distinct rock facilities. In 1939 Älvsborg Radio was built at Nya Varvet, a staff rock room was blasted in Billingen's east side around 1942, and the short-wave station received a separate rock room on Hängest…
Audit revision sweden-replacement-audit-2026.08.15. The central WBS below incorporates the 61-article review. The former deterministic low/base/high cases remain available only as sensitivities and revision history.
Direct works + owner / design / investigation + legacy concept contingency
Central quantities × current installed-rate screen.
Not yet probability-weighted. The current legacy concept contingency remains separate.
22% applied to the direct-work screen.
Raw model SEK 110.4m · rounded for Confidence E.
Transitional limitation. SEK 18,768,750 is still a blanket concept contingency, not probability-weighted expected risk. This is why the amount is labelled provisional. The audited telecom protected WBS remains the central scope ledger.
A separate protected radio cavern related to naval command; no area or equipment inventory is published.
25/100 article-geometry completeness. Detailed source extraction is available in the original-article audit.
Confidence E · geometry completeness 25/100
Do not add this blindly to related records. Related to the Nya Varvet article but not an explicit child of se-nya-varvet.
Largest active lines in the audited central component schedule.
The workbook publishes one revised central schedule. Its prior low and high stress cases are retained only under sensitivities; no line-level probability distributions are implied.
No explicit active base-WBS line.
No explicit active base-WBS line.
Integrated testing, commissioning and public-safe documentation · SEK 3,575,000
| Change | Scope | Audited base | Quantity / rate basis | Provenance |
|---|---|---|---|---|
| Retained | 05Secure technical building or inner fit-outBuilding | SEK 16,500,000 | 500 m² / 5,382 ft² × SEK 33,000 / Usable m²Class Proxy quantity · Assumption rateProxy for a small protected shortwave radio station with equipment, power and environmental spaces. | Existing archive WBS |
| Retained | 06Physical protection and resilienceProtection | SEK 10,000,000 | 0.56 Project × SEK 18,000,000 / ProjectAssumption quantity · Assumption rateOne protection package per 900 usable m² / 9,688 ft², subject to a 0.5-package minimum. | Existing archive WBS |
| Retained | 09Radio, transmission, power and cooling packageMission Systems | SEK 45,000,000 | 1 Site × SEK 45,000,000 / SiteAssumption quantity · Assumption rateThe estimate subject covers 1 facility. | Existing archive WBS |
| Added | R622Integrated testing, commissioning and public-safe documentation | SEK 3,575,000 | 5% of MEP/protection/mission-system scope | Class assumption — commissioning plan required |
Active base WBS SEK 75,075,000 · owner/design and contingency are added in the scenario cards above · 12 removed rows across the archive remain visible as change history.
The three inputs most likely to move the current screen.
These deterministic stress cases simultaneously vary quantities, rates, scope allowances and contingency. They are not confidence intervals and no longer serve as the headline answer.
Links support a rate, scope boundary or method. Context-only sources are not represented as quotations.
Public sources establish specialized tested products but not project prices.
The cited large-tunnel electrical award is a macro systems cross-check only; node package values are assumptions.
Protected shortwave communications for the naval command.
No lifecycle dates were established from the public source.
1 reviewed claims. Evidence locators resolve against the stored article hash or archived snapshot.
| Subject | Claim | Value | Date | Evidence | Certainty |
|---|---|---|---|---|---|
| technical system | Communications | Shortwave radio function received a separate protected cavern at Hängesten. | — | B009 | Reported |
No named project parties were extracted.