The article supports one buried modern county command post under a lawn, 600 m² / 6,458 ft² for about 60 people, with roof and walls each stated as more than 2 m of heavily reinforced concrete. It describes two standby generators, protected air treatment, groundwater cooling, extensive IT/comms and a Sveriges Radio studio. It reports SEK 50,000/m² but supplies no construction year or price-base date for that unit cost.
Länsledningsplatsen
The article-level geometry, cost and systems audit is preserved here even though no source photographs are available in the archive.
2 October 2015 · 0 photographs
What this source can support
Reviewed 15 August 2026 · geometry completeness 61/100 · Medium-low
The Command Buried classification is strong, but the SEK 84.1m base uses 600 m² / 6,458 ft² times 2 m³/m² despite direct thickness evidence. Depending on footprint and floors this can materially misstate the shell. The model also lacks explicit excavation, backfill, waterproofing and drainage. The site correctly leaves CPI/BKI blank for the undated SEK/m² figure.
published: 600 m² / 6,458 ft² floor area; roof over 2 m thick; walls over 2 m thick; buried beneath a lawn; approximately 60-person capacity | not_published: number of floors; footprint dimensions and perimeter; floor and foundation thickness; reinforcement schedule; excavation/backfill quantities; entry and escape geometry
reported construction intensity: SEK 50,000/m²; date, VAT basis, included scope and actual-versus-budget status are not stated
two standby generators; protected air purification; groundwater cooling; IT and communications; video conference and radio studio; support spaces
two-metre-plus shell surface area; reinforcement; excavation/backfill and waterproofing; standby generation and cooling; protected ventilation and penetrations; IT/comms and commissioning
One anonymous facility; operational use in the article means it is not a class example.
Calculate roof, walls, slab and foundation from plan-shape and floor-count scenarios; add cut-and-cover earthworks, backfill, waterproofing and drainage; separate two generators, groundwater cooling, CBRN ventilation, protected penetrations, communications and testing; keep the undated SEK 50,000/m² as an unindexed source observation until its date and scope are verified
as-built plan and floor count; shell section and reinforcement; construction/completion date; final account and scope of SEK 50,000/m²; portal/escape and utility routes; current performance brief
direct thickness evidence is not used geometrically; earthworks and water protection are omitted; undated unit cost needs a stronger warning; merged-source provenance should be visible at fact level
Facilities covered by this article
1 dossier connect the article to distinct facilities or facility groups.